Selasa, 27 Januari 2015

Gambar Konstruksi/RAB Semester 4


-->

I. Kerjakanlah Data Rencana Proyek dibawah ini sesuai dengan nomor absensi Anda.

No
Uraian/Jenis Pekerjaan
Nomor Absensi Siswa
1
Pengukuran dan Pemasangan Bouwplank
1, 6, 11, 16, 21, 26, 31
2
Galian tanah biasa sedalam 1m
1, 6, 11, 16, 21, 26, 31
3
Mengurug Pasir Urug
1, 6, 11, 16, 21, 26, 31
4
Pasangan pondasi batu kosong (Anstamping)
1, 6, 11, 16, 21, 26, 31
5
Pasangan Pondasi batu kali 1Pc : 8Ps
1, 6, 11, 16, 21, 26, 31
6
Pasangan bata merah tebal 1/2 bata, 1Pc: 3Ps
1, 6, 11, 16, 21, 26, 31
7
Pasangan bata merah tebal 1/2 bata, 1Pc: 8Ps
1, 6, 11, 16, 21, 26, 31
8
Plesteran 1 Pc : 3 Ps, Tebal 15mm
2, 7, 12, 17, 22, 27, 32
9
Plesteran 1 Pc : 8 Ps. Tebal 15 mm
2, 7, 12, 17, 22, 27, 32
10
Pekerjaan Beton Tumbuk 1Pc:3Ps:5Kr
2, 7, 12, 17, 22, 27, 32
11
Pekerjaan Beton 1Pc:2Ps:3Kr
2, 7, 12, 17, 22, 27, 32
12
Pembesian dengan besi polos atau ulir
2, 7, 12, 17, 22, 27, 32
13
Pasang bekisting untuk sloof (3 kali pakai)
2, 7, 12, 17, 22, 27, 32
14
Pasang bekisting untuk kolom (3 kali pakai)
3, 8, 13, 18, 23, 28
15
Pasang bekisting untuk balok (3 kali pakai)
3, 8, 13, 18, 23, 28
16
Pekerjaan kusen pintu dan jendela kayu (kamper)
3, 8, 13, 18, 23, 28
17
Pekerjaan daun pintu dan jendela kaca kayu (kamper)
3, 8, 13, 18, 23, 28
18
Pekerjaan pintu panil kayu (kamper)
3, 8, 13, 18, 23, 28
19
Pasang jalusi Kusen Kayu (Kamfer)
3, 8, 13, 18, 23, 28
20
Pasangan konstruksi Kuda-kuda kayu (kamper)
4, 9, 14, 19, 24, 29
21
Pasang Gording/Nok/Murplat Kayu (Kamper)
4, 9, 14, 19, 24, 29
22
Pasang kaso + reng kayu (Kamper)
4, 9, 14, 19, 24, 29
23
Pasang lisplank (3 x 20) cm kayu (kamper)
4, 9, 14, 19, 24, 29
24
Pasang genteng bubung palentong
4, 9, 14, 19, 24, 29
25
Pasang genteng palentong
4, 9, 14, 19, 24, 29
26
Pasang rangka langit-langit (1,00 x 1,00) m, kayu (kamper)
5, 10, 15, 20, 25, 30
27
Langit-langit Eternit (1,00 x 1,00) m, Tebal 5 mm
5, 10, 15, 20, 25, 30
28
Pengecatan bid kayu baru (1 lps plamur, 1 lps cat dsr, 2 lps cat pnutup)
5, 10, 15, 20, 25, 30
29
Pengecatan Tembok/Eternit baru (1 lps plamur, 1 lps cat dsr, 2 lps cat pnutup)
5, 10, 15, 20, 25, 30
30
Pasang lantai keramik 30 x 30 KW 1
5, 10, 15, 20, 25, 30
31
Pasang Engsel Pintu
5, 10, 15, 20, 25, 30
Hitunglah :
  1. Daftar Analisa Satuan Pekerjaan (sesuai dengan nomor absensi Anda).
  2. Rencana Anggaran Biaya (sesuai dengan nomor absensi Anda).
Catatan :
  1. Kerjakan pada lembar soal/formulir yang sudah disediakan.
  2. Semua lembar soal/formulir dikumpulkan ke Pengawas Ruang.
Selamat Mengerjakan